It's been a long, relatively quiet period since we last posted. During that time, the tie-beams atop the exterior block walls were poured, and a new, required septic system was installed behind the building. Other than that, there was little visible progress.

That all changed this morning with the delivery and erection of the structural steel which will support the roof. As of 3:00 pm today, that process was virtually complete. The next step will be the roof decking and actual roofing material. That should happen early next week, and, after the addition of the exterior windows and doors, the building interior will be protected from the elements paving the way for work on the interior walls.